{"id":11968,"date":"2021-09-17T15:47:30","date_gmt":"2021-09-17T22:47:30","guid":{"rendered":"https:\/\/marin-dpw-ca.proudcity.com\/?page_id=11968"},"modified":"2022-10-12T10:30:53","modified_gmt":"2022-10-12T17:30:53","slug":"airport-website-archive","status":"publish","type":"page","link":"https:\/\/publicworks.marincounty.gov\/airport-website-archive\/","title":{"rendered":"Airport document archive"},"content":{"rendered":"
ROD – Proposed Extension of Runway 13\/31<\/a><\/p>\n Final SEIS Cover Sheet[PDF]<\/span><\/a><\/p>\n Final SEIS Inside Cover[PDF]<\/span><\/a><\/p>\n Table of Contents[PDF]<\/span><\/a><\/p>\n Acronyms and Glossary of Terms[PDF]<\/span><\/a><\/p>\n Final SEIS Summary[PDF]<\/span><\/a><\/p>\n Chapter 1: Background[PDF]<\/span><\/a><\/p>\n Chapter 2: Purpose and Need[PDF]<\/span><\/a><\/p>\n Chapter 3: Alternatives[PDF]<\/span><\/a> Chapter 5: Environmental Consequences<\/p>\n 5.0:\u00a0Introduction[PDF]<\/span><\/a> Chapter 6: Cumulative Impact[PDF]<\/span><\/a><\/p>\n Chapter 7: List of Preparers[PDF]<\/span><\/a><\/p>\n Appendix A-1: Agency Scoping and Coordination[PDF]<\/span><\/a> Notice of Availability (EIS-NOA)[PDF]<\/span><\/a><\/p>\n FEIS Cover Sheet[PDF]<\/span><\/a><\/p>\n FEIS Inside Cover[PDF]<\/span><\/a><\/p>\n Table of Contents[PDF]<\/span><\/a><\/p>\n Acronyms and Glossary of Terms[PDF]<\/span><\/a><\/p>\n FEIS Summary[PDF]<\/span><\/a><\/p>\n Chapter 1: Background[PDF]<\/span><\/a><\/p>\n Chapter 2: Purpose and Need[PDF]<\/span><\/a><\/p>\n Chapter 3: Alternatives[PDF]<\/span><\/a><\/p>\n Chapter 4: Affected Environment[PDF]<\/span><\/a><\/p>\n Chapter 5: Environmental Consequences<\/p>\n 5.0:\u00a0Introduction[PDF]<\/span><\/a> Chapter 6: Cumulative Impacts[PDF]<\/span><\/a><\/p>\n Chapter 7: List of Preparers[PDF]<\/span><\/a><\/p>\n EIS Index[PDF]<\/span><\/a><\/p>\n Appendix Cover[PDF]<\/span><\/a> Notice of Availability (EIS-NOA)[PDF]<\/span><\/a><\/p>\n FEIR Cover[PDF]<\/span><\/a><\/p>\n Table of Contents[PDF]<\/span><\/a><\/p>\n Chapter 1: Introduction[PDF]<\/span><\/a><\/p>\n Chapter 2: Project Summary[PDF]<\/span><\/a><\/p>\n Chapter 3: Project Description[PDF]<\/span><\/a><\/p>\n Chapter 4: Environmental Settings, Environmental Impacts, and Mitigation Measures<\/p>\n 4.1:\u00a0Approach to the Environmental Analysis[PDF]<\/span><\/a>Final Supplement to Final Environmental Impact Statement (SEIS) January 2020<\/strong><\/h2>\n
Volume 1<\/h3>\n
\n
\nChapter 4: Affected Environment[PDF]<\/span><\/a><\/p>\n
\n5.1:\u00a0Noise[PDF]<\/span><\/a>
\n5.2:\u00a0Compatible Land Use[PDF]<\/span><\/a>
\n5.3:\u00a0Socioeconomic Impacts[PDF]<\/span><\/a>
\n5.4:\u00a0Secondary Impacts[PDF]<\/span><\/a>
\n5.5:\u00a0Air Quality[PDF]<\/span><\/a>
\n5.6:\u00a0Water Quality[PDF]<\/span><\/a>
\n5.7:\u00a0Department of Transportation 4(f)[PDF]<\/span><\/a>
\n5.8:\u00a0Historic, Architectural, Archaeological, and Cultural Resources[PDF]<\/span><\/a>
\n5.9:\u00a0Biological Resources[PDF]<\/span><\/a>
\n5.10:\u00a0Wetlands and Streams[PDF]<\/span><\/a>
\n5.11:\u00a0Floodplains[PDF]<\/span><\/a>
\n5.12:\u00a0Coastal Resources[PDF]<\/span><\/a>
\n5.13:\u00a0Wild and Scenic Rivers[PDF]<\/span><\/a>
\n5.14:\u00a0Farmlands[PDF]<\/span><\/a>
\n5.15:\u00a0Energy Supply, Natural Resources, and Sustainable Design[PDF]<\/span><\/a>
\n5.16:\u00a0Visual Resources[PDF]<\/span><\/a>
\n5.17:\u00a0Hazardous Materials, Pollution Prevention, and Solid Waste[PDF]<\/span><\/a>
\n5.18:\u00a0Construction Impacts[PDF]<\/span><\/a>
\n5.19:\u00a0Irreversible and Irretrievable Commitment of Resources[PDF]<\/span><\/a><\/p>\nVolume 2<\/h3>\n
\nAppendix B-1: Public Involvement[PDF]<\/span><\/a>
\nAppendix C-1: Aviation Activity Forecast[PDF]<\/span><\/a>
\nAppendix D-1: Runway Length Analysis[PDF]<\/span><\/a>
\nAppendix E-1: Noise[PDF]<\/span><\/a>
\nAppendix F-1: Air Quality[PDF]<\/span><\/a>
\nAppendix G-1: Water Quality[PDF]<\/span><\/a>
\nAppendix H-1: Cultural Resources[PDF]<\/span><\/a>
\nAppendix I-1: Biological Resources[PDF]<\/span><\/a>
\nAppendix J-1: Wetlands[PDF]<\/span><\/a>
\nAppendix K-1: Energy and Natural Resources[PDF]<\/span><\/a>
\nAppendix L-1: Hazardous Materials[PDF]<\/span><\/a>
\nAppendix M-1: Geology, Soils, and Seismicity Resources[PDF]<\/span><\/a>
\nAppendix N-1: Mineral Resources[PDF]<\/span><\/a>
\nAppendix O-1: Land Use Assurance Letter[PDF]<\/span><\/a>
\nAppendix P-1: Comments Received on the Draft Supplement to the Final EIS[PDF]<\/span><\/a>
\nAppendix Q-1: FAA Response to Comments Received on the Draft Supplement to the Final EIS[PDF]<\/span><\/a><\/p>\nFinal Environmental Impact Statement (FEIS) June 2014<\/strong><\/h2>\n
Volume 1<\/h3>\n
\n5.1:\u00a0Noise[PDF]<\/span><\/a>
\n5.2:\u00a0Compatible Land Use[PDF]<\/span><\/a>
\n5.3:\u00a0Socioeconomic Impacts[PDF]<\/span><\/a>
\n5.4:\u00a0Secondary Impacts[PDF]<\/span><\/a>
\n5.5:\u00a0Air Quality[PDF]<\/span><\/a>
\n5.6:\u00a0Water Quality[PDF]<\/span><\/a>
\n5.7:\u00a0Department of Transportation 4(f)[PDF]<\/span><\/a>
\n5.8:\u00a0Historic, Architectural, Archaeological, and Cultural Resources[PDF]<\/span><\/a>
\n5.9:\u00a0Fish, Wildlife, and Plants[PDF]<\/span><\/a>
\n5.10:\u00a0Wetlands and Streams[PDF]<\/span><\/a>
\n5.11:\u00a0Floodplains[PDF]<\/span><\/a>
\n5.12:\u00a0Coastal Resources[PDF]<\/span><\/a>
\n5.13:\u00a0Wild and Scenic Rivers[PDF]<\/span><\/a>
\n5.14:\u00a0Farmlands[PDF]<\/span><\/a>
\n5.15:\u00a0Energy Supply, Natural Resources, and Sustainable Design[PDF]<\/span><\/a>
\n5.16:\u00a0Light Emissions and Visual Impacts[PDF]<\/span><\/a>
\n5.17:\u00a0Hazardous Materials, Pollution Prevention, and Solid Waste[PDF]<\/span><\/a>
\n5.18:\u00a0Construction Impacts[PDF]<\/span><\/a><\/p>\nVolume 3<\/h3>\n
\nAppendix A: Agency Scoping and Coordination[PDF]<\/span><\/a>
\nAppendix B: Public Involvement[PDF]<\/span><\/a>
\nAppendix C: Aviation Activity Forecast[PDF]<\/span><\/a>
\nAppendix D: Runway Length Analysis[PDF]<\/span><\/a>
\nAppendix E: Noise[PDF]<\/span><\/a>
\nAppendix F: Air Quality[PDF]<\/span><\/a>
\nAppendix G: Water Quality[PDF]<\/span><\/a>
\nAppendix H: Cultural Resources[PDF]<\/span><\/a>
\nAppendix I: Biological Resources[PDF]<\/span><\/a>
\nAppendix J: Wetlands[PDF]<\/span><\/a>
\nAppendix K: Energy and Natural Resources[PDF]<\/span><\/a>
\nAppendix L: Hazardous Materials[PDF]<\/span><\/a>
\nAppendix M: Geology, Soils, and Seismicity Resources[PDF]<\/span><\/a>
\nAppendix N: Mineral Resources[PDF]<\/span><\/a>
\nAppendix O: Land Use Assurance Letter[PDF]<\/span><\/a>
\nAppendix P: Comments Received on Draft EIS\/EIR[PDF]<\/span><\/a>
\nAppendix Q: Response to Comments[PDF]<\/span><\/a><\/p>\nFinal Environmental Impact Report (FEIR) November 2013<\/strong><\/h2>\n
Volume 2<\/h3>\n
\n4.2:\u00a0Land Use and Planning[PDF]<\/span><\/a>
\n4.3:\u00a0Geology, Soils, and Seismicity