Fairfax-Bolinas Road CONDITION UPDATES, thank you for your patience: At milepost 5.73, Fairfax-Bolinas Road will be open on weekdays and weekends from 12/16/24 through 1/1/25 (weather permitting), with traffic controlled through a single lane with alternating access. This is to accommodate the holiday traffic. From 1/2/25 through 1/5/25, the road will be closed at milepost 5.73 to allow for construction activities as the project nears completion, weather permitting. After 1/5/25, it is anticipated that the road will be closed from Azalea Hill to Ridgecrest on weekdays only. By mid-January, the project is expected to be completed and the roadway will fully reopen. See project webpage for details.

Lucas Valley Road Slide Repair at milepost 3.92

This is a completed project. You are in the Archived Projects section of the website. Active projects can be found on the Projects webpage.

Description

Overview

The project involves installing an approximately 116-foot retaining wall to stabilize the roadway and reinforce the hillside. Additionally, repairs will be made to the damaged pavement.

Funding

The estimated $580,000 project is approved for Federal reimbursement from the Federal Highways Administration’s Emergency Relief Program.

Traffic impacts

The project will require closure of one lane during work hours (weekdays 7:00AM to 5:00PM), during which time traffic will flow through single-lane access and be controlled by flaggers. Traffic holds will be kept as short as possible, approximately five minutes, while still allowing crews to work safely. Both lanes will be open outside of work hours.

Timeline

September 2022

  • Construction starts week of September 12

October 2022

  • Construction expected to be finished by end of October
Close window