Fairfax-Bolinas Road CONDITION UPDATES, thank you for your patience: At milepost 5.73, Fairfax-Bolinas Road will be open on weekdays and weekends from 12/16/24 through 1/1/25 (weather permitting), with traffic controlled through a single lane with alternating access. This is to accommodate the holiday traffic. From 1/2/25 through 1/5/25, the road will be closed at milepost 5.73 to allow for construction activities as the project nears completion, weather permitting. After 1/5/25, it is anticipated that the road will be closed from Azalea Hill to Ridgecrest on weekdays only. By mid-January, the project is expected to be completed and the roadway will fully reopen. See project webpage for details.

Point Reyes Petaluma Rd and Nicasio Valley Rd Improvements

Description

Overview

Currently, for vehicular traffic traveling south on Point Reyes Petaluma Road and wanting to continue straight, as well as those wanting to turn left onto Nicasio Valley Road, have to share the same lane.  Also, for vehicular traffic traveling from Nicasio Valley Road, those wanting to turn left or right onto Point Reyes Petaluma Road have to share the same lane. This project will widen the southbound stretch of Point Reyes Petaluma Road, add a dedicated left turn lane or turn pocket and associated roadway widening, asphalt paving and improve intersection traffic safety.

Funding

Estimated project cost is $2.2M,  of which $1.8M is Highway Safety Improvement Program (HSIP) grant funded and the remainder will be funded from the County's Road and Bridge Fund.

Public impacts

During the construction phase, expect delays of up to 15 minutes between the hours of 8 am to 5 pm. There is the possibility of lane closures with traffic control measures in place.

Timeline

Fall 2024

  • Expected construction
Close window