Fairfax-Bolinas Road CONDITION UPDATES, thank you for your patience: At milepost 5.73, Fairfax-Bolinas Road will be open on weekdays and weekends from 12/16/24 through 1/1/25 (weather permitting), with traffic controlled through a single lane with alternating access. This is to accommodate the holiday traffic. From 1/2/25 through 1/5/25, the road will be closed at milepost 5.73 to allow for construction activities as the project nears completion, weather permitting. After 1/5/25, it is anticipated that the road will be closed from Azalea Hill to Ridgecrest on weekdays only. By mid-January, the project is expected to be completed and the roadway will fully reopen. See project webpage for details.

Upper Lucas Valley Northern Region Paving & Microsurfacing

This is a completed project. You are in the Archived Projects section of the website. Active projects can be found on the Projects webpage.

Description

Overview

The project will take place on residential roads located in the Upper Lucas Valley neighborhood. General concrete work and preparations for the roadway resurfacing and microsurfacing project are underway, including on sidewalks, curbs and gutters, ramps, and storm drainage on select roads. Additionally, utility work is being conducted by PG&E in advance of the roadway resurfacing project.

Improvements for the project include full width grinding, road base failure repair, road resurfacing, microsurfacing of select roads, minor drainage improvements, repair of concrete curb & gutter, sidewalks, and accessibility curb ramps; and traffic striping and marking.

Funding

The $1.5 million project is funded by the County's Road and Bridge Rehabilitation Fund.

Traffic Impacts

The work will take place during the daytime hours with traffic control measures. Advance notice will be given to residents to help minimize any inconveniences.

Timeline

The project was completed during the summer of 2021.